Sentient GridSTRIKE AI Mission Application
Mission Objective
PHASE I DEMONSTRATION

Municipal Water Utility Alpha

AI-enabled mission planning for coordinated cyber and physical infrastructure defense.

Focused proof-of-concept across OT telemetry, network monitoring, physical security, human approval, and response asset coordination.

Commander
Operations Commander
Mission Mode
SIMULATION
Review State
APPROVAL PENDING
Scenario
OT / ICS
Commander’s Intent
Threat Analysis
Plan Generated
Human Review
Asset Assignment
Execution
COMMANDER’S INTENT
Human-directed mission outcome
  • Protect Municipal Water Utility Alpha.
  • Maintain water service continuity.
  • Prevent cascading operational disruption.
  • Minimize cyber and physical impact.
OT Environment Model
Municipal Water Utility Alpha logical infrastructure
ACTIVE
Operations Center
Facility command
ACTIVE
Operations Commander
Plan approval
STAGED
Utility Maintenance Team
Field validation
ALERT
PLC-01
Affected controller
DEGRADED
Pump Station A
Telemetry degraded
CRITICAL
SCADA Server
Control authority
WATCH
Water Treatment Facility
Primary utility site
OPERATIONAL
Reservoir / Distribution Node
Continuity target
OPERATIONAL
PLC-02
Stable controller
WATCH
Pump Station B
Perimeter watch
RESPONDING
Cyber Response Team
OT containment
STAGED
Security Team Alpha
Physical response
Active OT / Cyber-Physical Incidents
Mock STRIKE scenario queue
Threat Assessment
Unauthorized PLC Command
Threat Level
CRITICAL
Risk Score
92/100
Confidence
88%
Affected Asset
PLC-01
Operational Impact
Pump Station A Telemetry Disruption
Unauthorized PLC command overlaps with suspicious network activity and pump state variance.
ATTACK CHAIN
Cyber + physical sequence
  1. 1Suspicious network activity reaches SCADA server
  2. 2Unauthorized command affects PLC-01
  3. 3Pump Station A telemetry degrades
  4. 4Physical perimeter breach near facility
  5. 5Drone / physical surveillance indicator detected
ROADMAP
Current scope and future scale
PHASE I
Municipal Water Utility Defense
(Current Proof-of-Concept)
PHASE II
Regional Power Grid + Transportation Network
(Cascading Effects Planning)
PHASE III
National Critical Infrastructure Defense
(Operational Deployment)

National deployment is future-state only; Phase I remains a focused municipal water utility proof-of-concept.